← All guides · Equipment & compliance
Tracking PAT testing dates with reminders
Venues ask for PAT certificates at the worst moments. How to record which items need testing and when in Gig Nest, and get reminded before dates slip.
The short answer
- Flag each item that needs PAT testing and record its last test date.
- Reminders tell you before a test falls due, not after a venue asks.
- Store the certificates alongside so they can be emailed to a venue.
Record it once and be reminded
To keep PAT testing under control, record against each item whether it needs testing and when it was last done, and let the system remind you. In Gig Nest both are fields on the equipment record, and the last test date drives reminders so nothing quietly goes out of date. That is the short answer. The longer one is about why this matters so much to working DJs, which is less to do with the testing itself and more to do with when the question tends to be asked.
The email on a Thursday afternoon
Every mobile DJ knows this one. Two days before a wedding, the venue's events office emails asking for your public liability certificate and PAT certificates, and says you will not be allowed to set up without them. You are fairly sure everything was tested last spring. You are less sure where the certificate went, and not sure at all whether the pair of uplighters you bought in the autumn were ever done. The gig is not at risk because your equipment is unsafe. It is at risk because you cannot prove, quickly, that it is fine.
Why stickers and memory fall short
The green sticker on the plug tells you an item was tested once. It does not tell you what else is due, and you have to be standing next to the item to read it. Kit bought partway through the year never joins the batch you had tested together, so over time the dates drift apart. New purchases, replacement leads and the spare amp that only comes out twice a year are exactly the things that slip through. A single date in your head for when the kit was done stops being true the first time you buy something.
How Gig Nest records it
On each item in the equipment register there is a setting for whether it needs PAT testing, and a field for the date of its last test. Mark the mains-powered items, enter the date from the certificate or the sticker, and the register knows the testing position of everything you own. Items that do not need testing, such as stands, truss and flight cases, are simply left unflagged so they do not clutter the picture. When a test falls due, you are reminded, which turns a job you used to remember in a panic into one that arrives on a list.
Keeping the certificates with the dates
A date on its own is only half of what a venue wants. They want the document. Gig Nest has a place for compliance documents where you store your PAT certificates and your public liability insurance. When a venue asks, you tick the documents they need and email them from your branded address, with a covering message you can edit. The dates in the register tell you that you are in order. The stored certificate lets you show it. Having both in the same account is what makes Thursday's email a two-minute job.
Bringing a tester in
When reminders start to appear, group the work. Most DJs have everything tested together once a year in the quiet season, because it is cheaper and easier than doing items one at a time. Before the tester arrives, use the register to list what is due, and use each item's location to gather it in one place, including anything that lives at a team member's house. When the certificate comes back, update the last test date on each item and store the new document. How often your equipment should be tested is a question for a qualified electrician and your insurer.
New kit and hired kit
Make it a rule that anything new goes into the register on the day it arrives, with its PAT setting filled in. That is the single habit that stops the dates drifting. If an item is new and you are relying on that for now, note the purchase date so you know when to include it in the next round. Kit you hire in for a one-off is the hire company's to certify, but ask for their paperwork when you book it, because the venue will ask you and not them.
What it says about your business
Venue coordinators deal with a lot of suppliers, and the ones who send the right documents within minutes of being asked stand out. It is a small thing that signals a properly run business, and it is remembered when a couple asks the venue who they would recommend. Being organised about testing will never be the reason someone books you. It can easily be the reason a venue is happy to have you back, and for most DJs venues are where a good share of the work comes from.
Questions people ask
- Does Gig Nest tell me how often equipment must be tested?
- No. Gig Nest records whether an item needs PAT testing and its last test date, and reminds you. How frequently your particular equipment should be tested depends on what it is and how it is used, so ask a qualified electrician and check what your insurer expects.
- Can I send PAT certificates to a venue from Gig Nest?
- Yes. Store your PAT certificates and public liability insurance as compliance documents, tick the ones a venue has asked for and email them from your branded address. The covering message comes from a template you can edit before sending.
- What about items that do not need testing?
- Leave the PAT setting off for anything without a plug, such as stands, truss, cases and props. They stay in the register for kit lists, values and locations, and they do not generate reminders or muddy the list of what is due.