The short answer

  • Build the running order once and treat it as the single agreed version.
  • The client sees the agreed timeline in their portal at any time.
  • Confirm key times with the coordinator the week before and log the reply.

One running order, not three

The short answer is to keep one timeline and make sure everyone is reading it. In Gig Nest the running order sits on the event, and the agreed timeline is always visible in the client's portal, so you and the client are looking at the same plan. The coordinator's own function sheet is the third version, and the job in the final fortnight is to make sure it matches. Most timing problems on the night are not anyone's fault. They come from the venue working to a sheet written in March and the DJ working to a conversation held in June.

Where timelines drift apart

A wedding timeline changes many times. The couple move the first dance to suit the photographer. The venue shifts the evening buffet to suit the kitchen. Someone adds a cake cutting. Each change is told to one supplier and not the others. By the day itself, the DJ believes the first dance is at eight, the coordinator has half past, and the couple have told their guests quarter to. The fix is not more emails. It is a single version that each change is made to, with everyone pointed at it.

Building the timeline in Gig Nest

You can type a running order the way you would say it, such as doors 7, buffet half 8, first dance at 9, and Gig Nest turns it into a structured timeline you can reorder and edit row by row. If the client completes the planning conversation in their portal, a draft running order is produced from their answers and lands on the event page for you to check. Either way you end up with a clean list of times and moments that you can adjust as plans firm up, without retyping the whole thing each time.

The client as the link to the venue

The client is usually the one in regular contact with the coordinator, so the portal matters here. They can open their event page on a phone during a venue meeting and read the agreed times aloud, or check them against the venue's own sheet. When the venue changes something, the client tells you, you update the timeline, and the portal shows the new version. Asking the couple to compare the two at their final venue meeting is a simple request, and it catches most discrepancies while there is still time to resolve them.

Speaking to the coordinator yourself

For the times that affect you directly, speak to the venue as well. Access time, when the room turns round between day and evening, the buffet, the bar closing and the finish are the ones to confirm. The venue register holds the contact name and number, so you know who to ask for. A short email the week before, listing your understanding of those five times and asking them to correct anything wrong, takes a few minutes. Record their reply in the event's notes and client comms log so there is a dated record.

When the venue's times win

Some times are not negotiable. A licence sets the finish. A kitchen sets the food. A room hired to two parties sets the turnaround. Where the coordinator's time differs from the client's wish, the venue's is normally the one that will happen, and the kindest thing is to tell the client early. Update the timeline to the real time and let them know why. A couple who learn in advance that the music stops at midnight plan around it. A couple who learn it at five to twelve remember it for the wrong reasons.

Getting it to your crew

On Team and Agency plans the running order is visible to assigned staff in their portal. When the plan is final, pressing Mark ready sends each crew member a summary by email and push with the date, time, venue, their role and any equipment to bring, and you can send it again if details change. That matters when the DJ on the night is not the person who did the planning. They arrive with the same timeline the client approved, and the venue notes for access and load-in alongside it.

A final check that takes five minutes

Two or three days out, read the timeline once from top to bottom as though you had never seen the booking. Does each moment have a time, and is there slack either side of the speeches? Is there anything you were told on the phone that never made it in? The AI set brief, written two days before, pulls the key timeline moments into a one-page summary, which is a useful second look at the same information. If the brief and your memory disagree, find out which is right before you load the van.

Questions people ask

Can the venue coordinator log in to see the timeline?
The agreed timeline is shown in the client's portal, which is the client's own private link. In practice the client shares the times with the venue, and you confirm the key ones with the coordinator directly using the contact on the venue record.
What if the client changes the timeline in the week of the event?
Update the running order on the event and the portal reflects the agreed version. If you have already marked the event ready on a Team or Agency plan, re-send the crew summary so whoever is working has the new times.
Does the timeline feed into the set brief?
Yes. The set brief includes the key timeline moments alongside the audience, must-plays, banned songs and practicalities. It is written two days before the event or whenever you ask for it, so regenerate it after a late change.